Proper installation is critical for the long-term reliability and safety of the lighting system. The process should always be performed by a licensed electrician following national and local electrical codes.
The process begins with mounting a backplate or the enclosure itself securely to a wall or inside a cabinet, ensuring it is level and plumb. The main power supply cables are then routed into the enclosure through appropriate cable glands. After ensuring the main power is off, the electrician connects the incoming live, neutral, and ground (earth) wires to the main isolator switch or main breaker terminals.
Next, individual outgoing circuit cables are connected to their respective MCBs. Each circuit breaker must be clearly labeled on the panel schedule to indicate the area it controls (e.g., "First Floor Corridor Lights"). All wiring must be neat, secured with cable ties, and connections torqued to specification. Finally, after a thorough visual inspection and testing for continuity and insulation resistance, the breakers are installed, the cover is secured, and the system is energized for final functional testing.